Data Center Migration
Same-city or cross-border moves, cut over in business-approved waves with a rehearsed rollback path at every step.
Overview
Migration risk lives in the dependencies nobody wrote down. We start with an equipment and dependency inventory, then build a wave plan where each wave has its own acceptance criteria and rollback condition.
Physical transport uses ESD packaging and climate-controlled vehicles; cutover covers DNS, BGP and load-balancer changes.
At a glance
| Scope | Intra-Hong Kong or cross-border |
|---|---|
| Planning | 2–4 weeks typical |
| Waves | Defined per business priority |
| Rollback | Documented and rehearsed per wave |
What we handle on site
Assessment: equipment list, dependencies, outage windows and a risk register.
Wave planning: sequenced by business priority with per-wave validation.
Transport: ESD packaging, climate control, customs paperwork where required.
Cutover: DNS, BGP and load-balancer switching with a rehearsed rollback.
Common questions
How is response time measured?
From the moment we accept the ticket in writing. Standard dispatch is four hours, one hour for emergencies, 24/7.
Which facilities do you cover?
Carrier-neutral facilities across Hong Kong plus our own partner sites in Tseung Kwan O, Tsuen Wan and Sha Tin.
How is the work priced?
Per ticket with a two-hour minimum, or a monthly retainer for recurring work. Quotes are written and based on site and task type.